I am a Year 8 student at Panmure Bridge School in Auckland, NZ. I am in Learning Space 2 and my teachers are Ms Kirkpatrick and Mrs Anderson.
Wednesday, 19 September 2018
Spaghetti Bridge Testing
For the past few weeks Ms Kirkpatrick's inquiry group have been constructing their bridges out of spaghetti pasta. In the beginning everything was pretty easy until the weeks started flying by and the assignment was nearly due. It was also difficult because of the limited supplies. The limited supplies forced all the groups to trade with one and other to get the project done. Ofa, Christopher, Te Pounamu and I built a cantilever bridge that was only able to hold one brick. The original design was to difficult to execute so we simplified it. If we had added more triangles or cross braces our bridge would have been able to hold more bricks. The total span of our bridge was 42 centimetres making it the second longest bridge. Sanujan, Jack, and Jericho had constructed a bridge that was able to hold six bricks in total. It was hilarious to see the bridges break and some of the designs were amazing. Personally I think that we had the best looking bridge and was only rivalled by Nyjah's. This has taught me that we should always look at strengthening the deck and to never become an architect.
Labels:
2018,
Inquiry,
Jeremiah,
Spaghetti Bridges,
Testing
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment